Cannon Design Increases Collaboration to Avoid Project Delays, Reduce Risk, and Improve Productivity

Publisher's description

Cannon Design wanted to take advantage of the firm's uniquely distributed knowledge approach and share best practices via a more collaborative, virtual work environment and ensure timely responses to thousands of Requests For Information (RFIs) and submittals (the process by which a contractor seeks architect approval for specific products) to avoid project delays and liabilities. The challenge was to improve the productivity of the professional staff. Cannon Design implemented Oracle's Primavera Contract Management to create a virtual collaboration environment and enabled Cannon Design's architects, engineers, and construction managers to coordinate with owners and contractors around RFIs, submittals, change orders, project finances, and more - regardless of their physical location.

Registration Required
File size not specified
File format PDF - Download the latest version of Adobe Acrobat Reader

Download for free now

Similar whitepapers

Are Your Electronic Documents Secure?: Manager's Checklist for Evaluating Your EDM System's Security

Since business documents and their content drive the decisions and record the transactions that take place in every business, it's critical for managers and their workers to ensure they're secure. In an age where digital file management is increasingly necessary for a business to operate efficiently and remain competitive, it's understandable the topic is receiving renewed attention, especially with several high-profile security breaches that should never have happened. Rest assured Electronic Document Management (EDM) is far more secure than managing paper-based documents - but only when one has a flexible, rules-based system that provides the levels of security one need.

31 days ago by Optical Image Technology Download

Compliance, Security, and Cost-Efficient Management: ECM Rises to the Challenge

The combination of a weak economy - causing many to streamline operations to keep afloat - and increasing regulatory demands made business challenging for many in 2009. Those that emerged from the rubble of crumbling profits, hoping to resurrect their bottom line and succeed in this decade are working harder than ever, often with fewer resources. Although the economy will eventually improve, the regulatory scene is becoming more demanding, placing greater burdens on business. Only those that make wise use of limited resources will survive.

32 days ago by Optical Image Technology Download

Raise Service Levels With Actual End-User Monitoring

Despite an environment where service is everything, organizations often find it nearly impossible to effectively monitor their content management systems. With Reveille Management Consoles for EMC Documentum and EMC Captiva InputAccel, one can gain realtime visibility into the health of application-specific components, processes, and actual end-user performance of the EMC content management solutions.

38 days ago by EMC Download

Collecting Compliance Evidence: The Role of Event Logs

It's no longer an option - businesses must follow federal regulations (such as Sarbanes-Oxley) to keep track of network activity. Event logs are key, providing a wealth of information to help your monitoring, retention and reporting challenges.

This Quest Software white paper discusses how to maximize the power of event logs. You'll learn about recent regulation changes, how your company can best prepare for an audit and the solution you need to address these issues.

Don't be unprepared. Read this valuable white paper today.

45 days ago by Quest Software Download

The Brand Management Breakthrough

Marketing organizations are under pressure to achieve a greater return on investment while delivering compelling interactive customer experiences. The attendee of this webcast will find out more about the new EMC Documentum solutions that can drive a significant return on the marketing assets.

46 days ago by EMC Download

Microsoft SQL Server 2008: What's New with R2

This white paper explores some of the new, major features included in Microsoft SQL Server 2008 R2. These features that were first announced at the SQL PASS Summit Conference in Seattle in November 2008, and are scheduled for release in the first half of 2010. These features are categorized under three main projects: Project Gemini, Project Madison, and Project Kilimanjaro. This white paper will discuss each of them.

47 days ago by Global Knowledge Download

Oracle whitepapers

Building Your Business Case for Best-Practice IT Services Delivery

This white paper examines various TCO components and complexities, as well as hidden costs, cost avoidance, and business impacts that companies can miss when building their business case. The paper discusses aspects of building a business case in assessing total cost of ownership in delivering best practices through an in-house IT service delivery model compared to the cost of an outsourced on-demand service delivery model.

19 days ago by Oracle Download

Enterprise Applications: The Cost of Keeping Current…Or Not

The cost of keeping current is represented as both time and money. Much of the "money" side of the equation is typically sunk cost in terms of the cost of the software and services combined with maintenance dollars paid to the solution provider. The time and effort to upgrade is an investment necessary to gain value from money already spent on software, implementation, and maintenance. Companies all too often fall into the trap of circular logic. They can't spend the time therefore they don't get the value, but without the value, they can't justify the time.

19 days ago by Oracle Download

Five Tips for Energizing your Sales Organization

Oracle Accelerate is Oracle’s approach to providing business software solutions to midsize organizations. The program started as a way to quickly implement industry-specific, on-premise ERP solutions by leveraging best practices, rapid implementation tools, and local partner expertise. Accelerate now includes new solutions for Oracle applications that automate specific business processes including CRM (Customer Relationship Management).

Increasingly, midsize companies look to CRM to energize their sales organizations and make the entire sales ecostystem more efficient. This briefing provides tips for choosing a CRM a system that keeps on delivering value for the long runâ€"systems that satisfy a deeper, enterprise-wide thirst for Return on Investment (ROI) across the entire IT platform.

19 days ago by Oracle Download

Customizing Security for Oracle WebLogic Server MBeans: A Quick Tour of Your Options for Ensuring Security for JMX Operations in Oracle WebLogic Server

Java Management Extensions (JMX) clients are used to both update the Oracle WebLogic Server configuration and monitor the running Oracle WebLogic Server domain. Oracle WebLogic Server provides a variety of configuration options and APIs to allow one to ensure security for the JMX operations. This paper will explore the various security features of Oracle WebLogic Server, concentrating on how these features can be used with JMX.

47 days ago by Oracle Download

Royal TenCate Cuts Manufacturing Costs by 20%, Shortens Month-End Reporting Time by 30%

Royal TenCate wanted to support the efficient production of advanced textiles and composites and address the difficulties in financial management across the business, such as multinational, multicurrency reporting. The challenge was to measure and manage production costs and monitor and control the use of raw materials to prevent waste. Royal TenCate gained end-to-end control of industry business processes, from order management to manufacturing and distribution and supported all manufacturing processes with JD Edwards' flexible mix-mode manufacturing functionality.

47 days ago by Oracle Download

Dah Chang Securities Saves US$469,000 (NT 15 Million) Annually in Logistics Costs

Dah Chang Securities wanted to replace a legacy COBOL system that did not offer the reliable performance needed to manage large numbers of trades and import over 100,000 pieces of data into a centralized repository to assist in managing high-risk customers. The challenge was to introduce self-service environment to reduce IT workload and install a centralized risk management system to protect the integrity of financial data. Dah Chang Securities engaged Oracle Partner Tera-Asper to implement an online trading system developed using Oracle Database, Oracle Real Application Clusters, and Oracle Database management tools and engaged Oracle Certified Advantage Partner Sysage Technology to implement the Oracle Database infrastructure.

47 days ago by Oracle Download